At this stage, we define the structural and functional requirements of all equipment or system providing to its placement in the plant and mechanical connection. Activity when it is developed as part of revamping is done through extensive field surveys in collaboration with structural engineers.  

 

 

 

Engineering activities start from the arrangement of equipment and piping in the offshore platforms, oil and gas, petrochemical, water treatment plants or sludge, cogeneration, thermal power stations. The services include the drafting of process diagrams (P & I), lists lines, material lists, technical documentation for the purchase of equipment, assembly systems, isometric 's workshop, media, stress analysis, practical PED, field surveys.

 

Main Activities:

  • Equipment list
  • Line List 
  • TDS (Technical Data Sheets)
  • Nozzle orientation
  • assembly and detail drawings
  • Isometrics
  • Stress Analysis
  • Supports sizing and positioning
  • Material take-off 
  • Equipments data-sheets
  • Painting and Insulation data-sheets
/